Lane Closures Planned at Roosevelt’s L&L Intersection, Highway 40 and 200 East

by | Sep 5, 2019 | News | 0 comments

Construction will soon slow down traffic in downtown Roosevelt City and all are asked to be alert and careful. The intersection of Highway 40 and 200 East is currently open to all traffic. Starting Monday, September 9th, however, work is scheduled to continue replacing the concrete pavement at the intersection. UDOT shares that the work will include lane closures with traffic reduced to a single lane in each direction. Please slow down and be careful if choosing to drive through construction zones. This is for your own safety and the safety of other drivers and workers. Be careful to observe traffic signs, signals, cones, workers, and equipment. 


Pin It on Pinterest

Share This
Skip to content