UDOT Preparing for Gusher Passing Lane and Center Turn Lane Project

The Utah Department of Transportation is hosting a meeting coming up on a pending Uintah Basin road project. The Gusher Passing Lane and Center Turn Lane project sounds self explanatory and includes adding a center turn lane in the town of Gusher and passing lanes on the outside of town. The public meeting hosted by UDOT will take place September 20th from 5 to 7pm at the Ute Lanes Family Fun Center. The meeting is for anyone interested in the safety improvements and what they mean to the public. Construction on the project is anticipated to start in the year 2020.

IMG_2296.PNG
Comment

Kristin Baldwin

Kristin never planned to work in news radio but has thoroughly enjoyed being part of the news team at KVEL. Her love of literature and writing developed in high school which led her to study English Literature and Technical Writing at BYU. She received her BA in English from BYU in 2005 and studied at UVU in Orem for 2 semesters to become a Certified Technical Writer in 2006. Two months after completion she began her dream job of being a stay-at-home mom.  As mother of 2 energetic kids, she began writing from home for the KVEL news team in 2011 and considers it the perfect fit as a full time mom and part time writer.