Discovery Elementary Sidewalk Project

Pickup and dropoff at Discovery Elementary in Vernal can be a bit of a nightmare and unfortunately the new sidewalk project expected to help alleviate the chaos will not be constructed in time for the new school year. According to Vernal City Mayor Sonja Norton, the delay in construction has been outside the City’s control. “A lot of us thought it would be in but it is federally funded through Safe Schools,” shares Norton, “and that federal process is the reason it is not in yet.” Vernal City was awarded about $195,000 dollars for the project from the UDOT Safety Sidewalk program for curb, gutter and sidewalk to improve pedestrian flow of students to and from the school. The sidewalk will be located on the south side of 1200 South from 650 West to 500 West. A neighborhood meeting has been scheduled for Thursday, August 11th at Discovery Elementary at6:00pm where the project engineers along with Vernal City will present the conceptual design and answer any questions about the project and its delay. The project is scheduled for construction to begin after the 2016-2017 school year ends.

Comment

Kristin Baldwin

Kristin never planned to work in news radio but has thoroughly enjoyed being part of the news team at KVEL. Her love of literature and writing developed in high school which led her to study English Literature and Technical Writing at BYU. She received her BA in English from BYU in 2005 and studied at UVU in Orem for 2 semesters to become a Certified Technical Writer in 2006. Two months after completion she began her dream job of being a stay-at-home mom.  As mother of 2 energetic kids, she began writing from home for the KVEL news team in 2011 and considers it the perfect fit as a full time mom and part time writer.